How to Get Building Plans Approved in Johannesburg and Ekurhuleni

Writer: Atu Msiska
Atu Msiska
Oct 4
3 min read
Aerial view of a land plot with clearly marked boundary lines, to ensure precision in construction planning and compliance.
Aerial view of a land plot with clearly marked boundary lines, to ensure precision in construction planning and compliance.

Whether you are adding a room, building a boundary wall or putting up a new home, South African law requires approved building plans before construction starts. In Gauteng, that means a submission to your municipality, usually the City of Johannesburg, the City of Ekurhuleni or the City of Tshwane. This guide explains how the process works and how to avoid the most common delays.


Why You Need Approved Plans

Section 4 of the National Building Regulations and Building Standards Act (Act 103 of 1977) states that no building may be erected without the prior approval of the local authority. Building without approval can lead to fines, stop-work orders and, in serious cases, demolition orders. Unapproved work also causes problems when you sell, insure or bond a property.


Approval is generally needed for new buildings, additions, structural alterations, carports, garages, boundary walls above a certain height, swimming pools and changes in use. Some minor building work may be exempt, but you should confirm with your architect before assuming so.


Step 1: Gather Property Information

Before design starts, your architect will need:


  • A copy of the title deed (to check restrictive conditions)

  • The SG diagram or site plan showing erf boundaries and servitudes

  • The zoning certificate from the municipality

  • Any existing approved plans for the property

  • Estate or HOA guidelines, if you live in a security estate


This is where many projects go wrong. A title deed condition, a building line or a coverage limit can make a design unapprovable before a single line is drawn. A site assessment catches these issues early.


Step 2: Design to Comply

Your plans must comply with the National Building Regulations (SANS 10400) and the local town planning scheme. Key items include building lines, coverage, height, parking, fire safety, ventilation, natural light, drainage and energy efficiency (SANS 10400-XA). If your design exceeds what the zoning allows, a separate town planning application (for example a building line relaxation or consent use) may be needed first.


Step 3: Prepare the Submission Pack

A typical submission includes:


  • Architectural drawings prepared by a SACAP-registered professional: site plan, floor plans, sections, elevations and drainage layout

  • The municipal application form, signed by the owner

  • Title deed, SG diagram and zoning information

  • Energy efficiency (XA) calculations or a rational design

  • Engineer's appointment for structural work where required

  • Estate or HOA approval, if applicable

  • Payment of the municipal plan fees


Step 4: Submission and Circulation

Once submitted, the plans are checked by building control and circulated to other departments, such as town planning, roads and stormwater, water and sanitation, and fire. Each department may approve or raise comments.


Section 7 of the Act requires the local authority to decide on an application within 30 days for buildings smaller than 500m² and 60 days for buildings of 500m² or larger, once a complete application has been received. In practice, incomplete submissions and comment rounds are what make approvals drag on.


Step 5: Respond to Comments Quickly

If council raises queries, your architect revises the drawings and resubmits. Clear, coordinated drawings from the start are the best way to limit resubmissions.


Step 6: Build, Inspect and Close Out

Approved plans are not the end. The municipality inspects at key stages during construction, and once the work is complete you will need the relevant compliance certificates to apply for an occupancy certificate. Read our guide to occupancy certificates in South Africa.


Common Reasons for Delays

  • Missing or outdated title deed and zoning information

  • Encroachments over building lines or servitudes

  • Incomplete energy efficiency information

  • Drawings that don't match the existing building on site

  • Missing owner signatures or estate approval

  • Unapproved existing structures on the property that must be regularised first


How TectArch Helps

We handle the full process: site and title deed checks, design, SANS 10400 compliance, council submission and follow-up until approval. We work across Johannesburg, Ekurhuleni, Tshwane and surrounding areas.


Book a Site Assessment to get expert advice before you spend on plans.


Written by Atu Msiska, Founder & Principal Architect, TectArch Architects.